Fund Raising for Water Supply System Recovery to 12 Villages 筹款为12个村庄重建水供系统

Donor List 捐款名单

With the kind coordination and contribution of Dr. Muhammad Noorhisyam with his schoolmates and Yayasan Nanyang Press, the water supply system recovery project in a total of 13 villages have been completed. However, 12 villages are still awaiting for funds for the water supply system recovery project.

在协助了昆达山重建水槽后,南洋报业基金决定再下一城,在接下来的两个月内,再协助另外12个村庄重建水槽,让当地居民能有安全的水源,然而,这一切都需要广大民众的捐助方能完成的工程。

List of villages awaiting for sponsorship and details:

Name of Village
村庄名称
Fund Needed per Project (RM)
款项
Construction Duration (Days)
建工期限
No. of Families
住户
Approx. No. of Villagers
村民人数
1. Kg Merugin6769.80750450
2. Kg Damai Masin7830.90524225
3. Kg Teruntongan16,023.50745200
4. Kg Kembiroi2190.003155455
5. Kg Sinisian6585.00560450
6. Kg Laab5023.00519115
7. Kg Lobou Lama11,011.00925225
8. Kg Tagarangan7507.0061285
9. Kg Tibabar12,225.501660420
10. Kg Pinawantai, Kg Tiokon and Kg Togop Laut 30,951.0014-16250800
Total:106,116.70



Sabah Ranau 5.9 Magnitude Earthquake

Sabah Ranau 5.9 Magnitude Earthquake



Sabah Ranau 5.9 Magnitude Earthquake



Sabah Ranau 5.9 Magnitude Earthquake